As of July 2019, GR INDTECH has been implementing the following new projects:

I – Central Processing Plant of Chu Prong Rubber Company Limited:

+ Wastewater treatment system for rubber production with a capacity of 1200 m³/day;

+ Location: Chu Prong – Gia Lai.

+ Link to article about the project: https://gr-indtech.com/du-an/nha-may-che-bien-trung-tam-cong-ty-tnhh-mtv-cao-su-chu-prong-80.html

II – High-tech pig farming village in Vietnam, belonging to GREENFEED Group:

+ Wastewater treatment system for pig farming with a capacity of 600 m³/day;

+ Location: Binh Thuan;

+ Link to the article about the project: https://gr-indtech.com/du-an/trang-trai-chan-nuoi-heo-cn-cao-lang-viet-nam–greenfeed-viet-nam-79.html

III – Rubber production plant of Toan Nang Production & Trading Co., Ltd.:

+ Rubber production wastewater treatment system with a capacity of 1500 m³/day;

+ Location: Phu Giao – Binh Duong;

And many other projects currently in the consulting, design & bidding phase.